A-Frame Project: Windows Are In

After long last, the windows arrived. The front windows from Jeldwen caused the delay. They took what felt like two months to come in, while the other windows had all arrived and were waiting for installation.

And we got our side entry in place with an overhang to shield someone from the elements while they are unlocking the door. 

We added a square window on the right wall of the living area to shed light on that side and at that level. The size of the window in the kitchen was increased and changed from a small rectangular sliding window to a square, fixed window that has black grids and frame on the exterior.

Great turnout with the window in the new, larger stairwell. I would’ve liked for the window to have been a bit taller and my design plan called for a larger window but I was talked out of it somehow but those windows took so long to arrive, I can’t remember why.

A bookcase is going in that space under the stairs that will be re-configured soon. The addition of a small pantry cabinet behind the bookcase will provide another space for kitchen storage or for whatever the homeowner chooses to store there.

A new view of the trees and more light in the master bedroom.

Thanks for playing,






 
 
 
 
And now a quick word from our sponsors!







SHOP OUR VIBES:
Written By
More from Sarah

Rita Konig Writes Inside Out

Thanks to the blog Apartment #412 I discovered that Rita Konig (former...
Read More